Contact

Book a NetCosm demo

Tell us a little about your organisation and we will reply by email.

Cabling and connectivity

Every cable, from port to port

Patch by dragging between ports, let NetCosm route cables along your trays and work out the length, then trace any circuit end to end.

Cable trace · core-rtr-01 to SW-1End-to-end tracecore-rtr-01 Eth1/1Patch cord · Cat6A · 3 mPatch Panel PP-A1 · port 12Permanent link · Cat6A · tray routePatch Panel PP-B3 · port 12Patch cord · Cat6A · 2 mSW-1 Gi1/0/483 cable(s), 14.6 m, 2 panel(s) crossedVerdict: ends at deviceCable length12.4 mcalculated15 mnext stock lengthin-rack + drop + tray + loopTray fill38%62% against 50% limitRouting skips full traysand tight bends.
01

Patch where you can see it

Ports appear as chips on the rack elevation, coloured for data, fibre or power. Drag between chips, or click two.

02

Lengths worked out

Cable length is calculated from every allowance, then rounded up to the next stock length.

03

Trace the whole path

The trace crosses patch panels, lists each hop and ends with a verdict.

How it works

From setup to answer in four steps

  1. Draw the containment

    Trays mode draws containment that snaps to shared junctions, each segment with a type, height and segregation class.

  2. Patch the ports

    One cable per port, and media must match: copper to copper, fibre to fibre, power to power.

  3. Route and measure

    Cables mode routes each cable along the shortest suitable tray path and calculates its length.

  4. Schedule and label

    Export the cable schedule to Excel or PDF, and print labels marked This end and Far end.

In the console

What you can do

Routing that obeys the rules

Auto-routing skips trays of the wrong segregation, trays with no fill headroom and trays whose bend radius is too tight for the cable. When no route exists, the planner says why. Trays show live fill: green, amber above 50% and red above 80%.

Tray fillContainment segmentsTray T-A138%Tray T-A262% against 50% limit

Lengths and stock sizes

Length is built from in-rack, rack drop, tray route, far drop, service loop and termination allowances, then rounded up to the next stock length, with a warning when the run is longer than the cable spec allows.

Cable lengthCat6A, 7.5 mm, 90 m maximumCalculated12.4 mStock length15 mMaximum run90 m

Cross-connects, start to finish

A board takes each cross-connect through Requested, Quoted, Accepted, In progress and Live. Accepting raises a patch work order, and going live adds the one-off charge and sets up the monthly charge on the customer's billing.

Cross-connect boardOrder statesRequestedQuotedAcceptedIn progressLiveCease requestedCeased
FAQ

Frequently asked questions

How do we patch?

Drag or click between port chips on the rack elevation, or patch whole ranges at once.

Does it calculate cable lengths?

Yes. It adds in-rack, drop, tray route, service loop and termination allowances, then rounds up to the next stock length.

How does routing work?

Cables follow the shortest suitable tray path, avoiding wrong segregation, full trays and tight bends. When no route exists, it says why.

Can I trace a circuit end to end?

Yes. The trace crosses patch panels, lists each hop and ends with a verdict such as ends at device, open or loop.

Do you handle cross-connect orders?

Yes. A board takes each order from Requested to Live, raises the patch work order and sets up the charges.

Can we get a cable schedule for installers?

Yes. It exports to Excel and PDF with stock-length counts per spec.

United Kingdom

NetCosm is hosted in the United Kingdom, so your rack, power and network records stay in the UK.

See it on your own floor

Book a demo and we will walk through it with your rooms, racks and addresses in mind.

Book a demo