Contact

Book a NetCosm demo

Tell us a little about your organisation and we will reply by email.

Capacity planning

Can Hall 2 take four 20 kW racks?

Ask the question in the form it is asked on the floor. NetCosm answers yes or no, names the limiting factor and shows the records it used.

Capacity question · Hall 2Capacity questionSiteHall 2Racks4kW per rack20Needed by1 MarchRack typeStandard (optional)AskAnswerNoLimiting factor: coolingChecked in order: change freeze,space, power, cooling.Power45 of 60 kWCooling (N+1)52 of 60 kWSpace4 free positions80 kW needed on top of 52 kW;90 kW usable at N+1.Why: headroom by room
01

A straight answer

The Capacity question takes a site, a number of racks, kW per rack and a date, and answers Yes or No with the limiting factor named.

02

Headroom you can trust

Space, power, cooling, weight and port totals roll up from rack to room, floor, building and site.

03

See the run-out coming

A 12-month forecast shows the first month each threshold reaches warning and critical.

How it works

From setup to answer in four steps

  1. Ask

    Enter the number of racks, kW per rack, the needed-by date and, if you like, a rack type.

  2. Checks run in order

    Change freeze, then space, then power, then cooling. The first one that fails is the limiting factor.

  3. See why

    Each answer lists the records it used and has a Why: headroom by room view.

  4. Hold the space

    Reserve U ranges and kW for a named customer or project until a date, and plan ahead with the forecast.

In the console

What you can do

Cooling that allows for redundancy

Usable cooling counts every unit at N, drops the largest unit at N+1 and halves the total at 2N. A rack's cooling load is its design kW, or its allocated power when no design figure is set. Placing a rack also checks floor loading in kg/m² and liquid cooling loop headroom.

Headroom · Hall 2Room Hall 2Power45 of 60 kWCooling (N+1)52 of 60 kWSpace4 positions free

Forecast, thresholds and reservations

Set warning and critical thresholds for space, power, cooling, ports or floor loading, each with a named owner. The forecast fits a trend to at least three months of history and adds approved applications, live reservations and project demand.

Site forecastUsed 58, 60, 62 of 100Warning at 70%in about 4 monthsCritical at 90%beyond horizonOwnernamed per threshold

Reclaim what is idle

A reclaim plan finds idle, live, owned devices with CPU under 5% and traffic under 1 Mbps for 30 days. It never proposes DR devices or devices with no owner, ranks candidates by monthly cost and carbon, and needs a named approval.

Reclaim planCandidatesCPU under 5%30 daysTraffic under 1 Mbps30 daysDR devicesnever proposedApprovalnamed approver
FAQ

Frequently asked questions

Can it tell us if a hall can take new racks?

Yes. Give the number of racks, kW per rack and the date; it answers yes or no and names the limiting factor.

How is cooling headroom worked out?

From cooling units with redundancy applied (N, N+1 or 2N) against each rack's design or allocated kW.

Does it forecast when we will run out?

Yes. A 12-month trend from monthly history, plus approved demand and reservations, shows the month each threshold is reached.

Can we hold space for a customer?

Yes. U ranges and kW can be reserved for a named customer or project until a date.

Who sets the thresholds?

You do: warning and critical percentages per measure, each with a named owner.

Can it find kit we could switch off?

A reclaim plan lists idle, owned devices ranked by cost and carbon, for approval.

United Kingdom

NetCosm is hosted in the United Kingdom, so your rack, power and network records stay in the UK.

See it on your own floor

Book a demo and we will walk through it with your rooms, racks and addresses in mind.

Book a demo